First map shows critical infrastructures within a 3 mile buffer of Memorial Stadium. Hospitals have been identified to be potential sites of a secondary target. Knowing the locations of Hospitals within the 3 mile buffer, authorities can add additional security measures and monitor activities in these areas. Second map is a Line of Sight analysis of surveillance position around Memorial Stadium. The graph indicates the need for a secondary surveillance position on Line A around the 150 meter location. Third map shows some of the same information in third map just in a 3D rendition. All tasks went smoothly. Only hurdle was I could not import layers created in last weeks project into ArcScene. It had to be the actual DEM file and Orthophoto.














This is a Return Period Flood scenario created using HAZUS MH along what I believe to be Irwin Creek. Area included contains 73 square miles, 2,821 census blocks, 54,873 residential buildings and a total of 63,883 buildings. It is estimated that 178 households will be displaced and 457 people will need Short Term Shelter. Economic Losses to Residential Property is estimated to be 9.4 million dollars with Total Property Losses at 22.97 million dollars.